© 1923-2019 ZIV Machine-building plant named after V.V. Vorovsky, LLC

  • Vkontakte - Grey Circle
  • Facebook - Grey Circle
  • LinkedIn - Grey Circle

URB-2A-2 on shassis  MTLBU (TGM2)

DRILLING RIG

Drilling rig URB-2A-2 on the chassis MTLBU (TGM2) is intended for drilling geophysical and stratigraphic test oil and gas wells, for exploration of deposits of solid minerals, construction materials, for geological engineering surveys, as well as for drilling water supply wells and shot holes.

1/2

Cabin enlarged for 8 persons

Additional heater

Additional tool tanks

Triple heated hydraulic tank

Technical Characteristics

Chassis

Conventional depth of drilling:

for stratigraphic test wells with flushing, m                            300

for geophysical wells with flushing ,m                                   100

for geophysical wells with blowing, m                                    50

by auger drilling, m                                                                 50

Drilling diameter:

initial one for stratigraphic test and

geophysical wells with flushing , mm                                     190

final one for geophysical wells with flushing, mm                  118

final one for stratigraphic test wells:

with flushing, mm                                                                    93

with blowing, mm                                                                    118

by auger drilling, mm                                                             135

Allowable load on the hook (elevator), at most, kN (kgf)        50 (5000)

Drilling assembly pulling speed, m/s                                      0…1,25

Spindle rotation speed, rpm                                                   132/213/307  

Maximum rotation torque, Nm                                                 2200 

Spinner stroke, mm                                                                  5200

Operational pressure in hydraulic system,Mpa (kgf/cm2)      10(100)±5%

Overall dimensions, at most:

in transport position, mm                                                         8100x2850х3400

in operational position, mm                                                     8100x2850x8150

Complete weight of the rig, at most:  kg                                 15500
 

Chassis MTLBU (TGM-2, SGT-31)

Completeness

Compressor 4VU1-5/9M32, KV-10/10GTT

Mud pump NB4-160/63, NB-32 (NB-50)

Machine hour meter (operating time sensor)

Accessories

A set of tools for directional drilling

Welding generator GD-4006

Winch TN-14, TN-18, LBS-100, LBS-250

Static and dynamic sensing devices

URB-2D3 on shassis  MTLBU (TGM2)

DRILLING RIG

URB-2D3 drilling rig is intended for rotary drilling with flushing, blowing, by rotarypercussion drilling by means of a downhole hammer and augers for wells different purposes including water supply ones. URB-2D3 drilling rig enables high-performance drilling in rocks of any rigidity.

Cabin enlarged for 8 persons

Additional heater

Additional tool tanks

Triple heated hydraulic tank

1/2

Chassis

Technical Characteristics

Conventional depth of drilling:

for stratigraphic test wells with flushing, m                            350

for geophysical wells with flushing ,m                                   100

for geophysical wells with blowing, m                                    30

by auger drilling, m                                                                 30

hydrogeological, m                                                                 150

Drilling diameter:

initial one for stratigraphic test and

geophysical wells with flushing , mm                                     190
Allowable load on the hook (elevator), at most, kN (kgf)        63 (6300)

Drilling assembly pulling speed, m/s                                      0…1,25

Spindle rotation speed, rpm                                                    33/66/92/184 

Maximum rotation torque, Nm                                                 4000

Spinner stroke, mm                                                                  5200

Overall dimensions, at most:

in transport position, mm                                                         8330x3900x3980

in operational position, mm                                                     8530x3900x8380

Complete weight of the rig, at most:  kg                                 13830
 

Chassis MTLBU (TGM-2, SGT-31)

Completeness

Accessories

Compressor 4VU1-5/9M32, KV-10/10GTT

Mud pump NB4-160/63, NB-32 (NB-50)

Machine hour meter (operating time sensor)

Directional drilling accessories kit

Drilling tools and equipment (drill pipes, locks, adaptors, bits, etc.) AtlasCopco pneumatic impact tools

Hydraulically driven auxiliary winch with capacity from 700 kg  to 1800 kg

16 or 30 kW power generator

Welding generator

Pipe holder

Static and dynamic sensing devices

URB-2NT on tractor shassis  

DRILLING RIG

URB-2NT drilling rig is intended for vertical and directional drilling of expendable wells for solid mineral deposits, geophysical and stratigraphic test oil and gas wells in rotary manner, with bottom-hole flushing or by auger drilling, within areas accessible for crawler  transports.

All mechanisms included in the installation are mounted on its own frameattached to the frame of the skidder and powered by its engine.

Operational peculiarities

1/1
  • Hydraulically driven spinner displaced along the mast provides fast spin-up and break-off of drill pipes. The spinner performs together with the hydraulic lift work on the descent — lifting of the tool and its supply during drilling.

  • With the help of a spinner, screwing and unscrewing of drill pipes is carried out.

  • nstallation control is concentrated on the control panel.

  • It is possible to drill wells with cleaning by flushing or blowing (including air hammers), as well as auger drilling.
     

Technical Characteristics

Chassis

Conventional depth of drilling:

for stratigraphic test wells with flushing, m                            200

for geophysical wells with flushing ,m                                   100

for geophysical wells with blowing, m                                    50 

by auger drilling, m                                                                 30

exploratory wells with hard-alloy bits, m                                150
exploratory wells with diamond bits, m                                  200

 

Drilling diameter:

initial one for stratigraphic test and

geophysical wells with flushing, mm                                     151

final one for geophysical wells, mm                                       118

with flushing and blowing, mm                                               93

final one for structural exploratory wells, mm                         76

final one for exploratory wells with hard-alloy bits, mm          57 

exploratory, mm                                                                      135


Drilling assembly pulling speed, m/s                                      0…1,2 

Drilling assembly rotation speed, rpm                                    0…800 

Spindle rotation speed, rpm                                                   143/232/333

Maximum rotation torque, Nm                                                 2010

Angle of inclination of the well to the horizon, degrees           60-90                    

Spinner stroke, mm                                                                  5200

 

Overall dimensions, at most:

in transport position, mm                                                        7600x2800õ3750

in operational position, mm                                                    7200x2800x7850

Complete weight of the rig, at most:  kg                                 16000
 

Logging tractor chassis TL-5ALM-01, TT-4
 

Completeness

Accessories

Self-contained compressor plant KV-10/10C

Compressor 4VU1-5/9M32 (2 pcs.), ÀK-10/10-011

Mud pump NB4-160/63

Machine hour meter (operating time sensor)

Drilling tools and equipment (drill pipes, locks, adaptors, bits, etc.) Static and dynamic sensing devices)

On the drilling rig can be mounted nodes URB-2D3

URB-4T on tractor shassis  

DRILLING RIG

URB-4T drilling rig is intended for drilling geophysical and stratigraphic test oil and gas wells, for exploration of deposits of solid minerals, construction materials, for geological engineering surveys, as well as for drilling water supply wells and shot holes.
 

1/2

Technical Characteristics

Chassis

Conventional depth of drilling:

for stratigraphic test wells with flushing, m                            300

for geophysical wells with flushing ,m                                   100

for geophysical wells with blowing, m                                    50 

by auger drilling, m                                                                 30

Drilling diameter:

initial one for stratigraphic test and

geophysical wells with flushing, mm                                     190

final one for geophysical wells, mm                                      118

final one for stratigraphic test wells:

with flushing, mm                                                                   93

with blowing, mm                                                                  118

by auger drilling, mm                                                            150

Allowable load on the hook (elevator), at most  kN (kgf)       50 (5000)
Drilling assembly pulling speed, m/s                                     0…1,2 

Spindle rotation speed, rpm                                                  143/232/333

Maximum rotation torque, Nm                                                2010

Spinner stroke, mm                                                                 5200

 

Overall dimensions, at most:

in transport position, mm                                                        7850x2750х3980

in operational position, mm                                                    6920x2750x8325 

Complete weight of the rig, at most: kg                                 17500
 

Logging tractor chassis TL-5ALM-01, TT-4
 

Completeness

Accessories

Self-contained compressor plant  KV-10/10C

Compressor 4VU1-5/9M32 (2 pcs.), AK-10/10-011
Mud pump NB-50 

Machine hour meter (operating time sensor)

Directional drilling accessories kit
Drilling tools and equipment (drill pipes, locks, adaptors, bits, etc.)
Static and dynamic sensing devices)
On the drilling rig can be mounted nodes URB-2D3

ПРЕЗЕНТАЦИЯ_ЗИВ_2019_ ЛОГО1.png